Unit is totally automatic but you must run water thru the unit before plugging it in for
the first time !!!!!!!!!!!!!!!!!
Installation Instructions: The Stallion works best when temperatures are above 60
degrees
Once the faucet or hose spicket is turned on, hot water will
come out instantly. SET THE TEMPERATURE BY REGULATING THE FLOW OF WATER
Shower Installation:
1. Remove existing shower head
2. Screw the heater firmly onto the pipe.
Tighten the heater with an adjustable wrench.
3. Screw on the shower head (use shower head provided)
Plug the heater to a receptacle* six feet away from the shower area
* 25 amp electric circuit for exclusive
use of heater.Extensions can be used provided the wire is rated at 30 amps, and does not exceed 10ft.
Installation
Finished!
Outdoor Installation: Unit must be screwed directly onto hose spicket. Then attach
hose. Next, attach hose head (provided). Do not use hose nozzle! Do not restrict the flow of water! To stop water flow, turn
off spiket. Unit must be higher than the hose
1. Screw spicket adapter onto existing water supply line (the point where your garden hose connects)
2.
Screw one end of the adapter onto the back of the heater
3. Screw the heater firmly onto the pipe. Tighten
the heater with an adjustable wrench
4. Screw on garden hose adapter
5. Attach garden hose
6. Screw shower head onto hose
7. Plug the heater to a 25 amp exclusive receptacle six feet away
8. Attach garden
hose(use of hose nozzle, not recommended)
9. Do not restrict water flow(do not use hose nozzle)
Installation Finished !
Do not submerge unit. May cause fatality
Full
2 year replacement warranty
FAQs - Showers and Electric Showers
Verify if
the circuit breaker and the wires of your installation comply the product specifications. These ítems are essential
for your safety and the well performance of the product.
Hot Head Heaters WorldWide
131 Carr Ave
Keansburg, New Jersey 07734
888-892-2987 ext. 303